Train Depot

Stage 1

Purchase depot

The depot is currently on........

Depot side

Depot back

Depot front

Stage 2

move depot and exterior remodel

Once the depot is secured on the new foundation the exterior work can be done and the depot can be made weather tight.

Next to grange

Across from grange

Site of the burned down elevators

Stage 3

Remodel interior

With the depot dried in, the interior work can be done.

Ticket window

Lobby entrance

Lobby